Some frequently asked questions from DIY enthusiasts who want to lay their own driveway, pour footings, path bases or small foundations:

 

Is the weather important?

Extreme temperatures and rain can all cause problems. Protection with plastic sheeting and hessian may be needed to prevent the concrete freezing or the surface washing off.

 

When will concrete be delivered?

Delivery time will be agreed when you place your order: we usually require at least 24hrs notice.

 

What mix do I need?

Various mix specifications are available and the type you will need depends on the job you are doing. If you are unsure of your requirements, please contact us for advice on the best option (see ‘Contact Us').

 

How big is the concrete truck? Will it be able to get to my delivery point?

Our trucks are heavy and weigh up to 18 tons. They are approximately 2.5m wide and, depending on the quantity ordered, they can be anything from 5.9 to 8.75m long. Please note that vehicles of these lengths often have very limited turning circles.

 

How long does it take before concrete goes off?

On average, it takes 1-2hrs for the concrete to set once it arrives on site.  If requested, we can add an admixture to delay the rate of stiffening to about 3hrs, depending on temperatures.

 

Will my slab crack?

There is nothing a readymix supplier can do to prevent any mix from cracking. However, following our website guidelines (click on our ‘Identify and Prevent Cracking' brochure) will minimize cracking.  The use of fibres (UltraTM Series Fibre) will also help to reduce plastic shrinking and cracking.

 

Do I have to wheelbarrow the concrete?

No, we can provide a concrete pumping service, which is particularly useful for areas where access is restricted or difficult.  Pumping the concrete is also much quicker. Ask about our pumping services when you call to place your order.